
European Law Courts in Luxembourg with refined concrete slabs from SCHOMBURG ICS
Inside the law is discussed, outside there are distinctive rectangular 1 x 2 m floor slabs on the forecourt and the surrounding external area. The newly constructed European law courts were finished last year in Luxembourg, impressive alone through its 22,000 m² paved area.
Inside the law is discussed, outside there are distinctive rectangular 1 x 2 m floor slabs on the forecourt and the surrounding external area. The newly constructed European law courts were finished last year in Luxembourg, impressive alone through its 22,000 m² paved area.

SCHOMBURG ICS GmbH presents BETOCRETE-C-Series for the active waterproofing of concrete
The three part BETOCRETE-C series serves as an internal waterproofing of concrete in contact with the ground and water. The C series contains the only liquid concrete additive in the world for crystalline waterproofing compliant with EN 934-2 accreditation. The problems associated with lump formation in concrete with powder-based additives of a similar type can be effectively counteracted with this product.
The three part BETOCRETE-C series serves as an internal waterproofing of concrete in contact with the ground and water. The C series contains the only liquid concrete additive in the world for crystalline waterproofing compliant with EN 934-2 accreditation. The problems associated with lump formation in concrete with powder-based additives of a similar type can be effectively counteracted with this product.

GEPOTECH coating system from SCHOMBURG with new applications – prevention of parasitic current corrosion in a flash
During the use of tramways that are powered by electricity, there can be slight corrosion due to parasitic or stray current, if conductive building components are in contact with the ground without insulation. In order to prevent this electrochemical reaction, the road and rail construction division of SCHOMBURG ICS GmbH has developed a new product as an extension to its coating system GEPOTECH.
During the use of tramways that are powered by electricity, there can be slight corrosion due to parasitic or stray current, if conductive building components are in contact with the ground without insulation. In order to prevent this electrochemical reaction, the road and rail construction division of SCHOMBURG ICS GmbH has developed a new product as an extension to its coating system GEPOTECH.

Adhesives from SCHOMBURG under heavy traffic loading – natural stone pavers become an almost monolithic roadway
The load from lorry and bus wheels on the surface of natural stone paving produces high dynamic forces, individual stones are literally under threat of going off the rails. In order to counteract these problematical frequently heavily loaded areas, the road and track construction division of SCHOMBURG ICS GmbH
has developed two special adhesives. INDUCRET-VK-2000 (Fugenkleber/joint adhesive) and INDUCRET-VK-1000 (Bettungskleber/paving mortar) provide an almost monolithic stability.
The load from lorry and bus wheels on the surface of natural stone paving produces high dynamic forces, individual stones are literally under threat of going off the rails. In order to counteract these problematical frequently heavily loaded areas, the road and track construction division of SCHOMBURG ICS GmbH
has developed two special adhesives. INDUCRET-VK-2000 (Fugenkleber/joint adhesive) and INDUCRET-VK-1000 (Bettungskleber/paving mortar) provide an almost monolithic stability.

INDUFLOOR-IB3350-VC2 – conductive floor coating for sensitive production areas
When may one talk about innovation? Innovation literally means “Newness and renewal”. In order to produce something new then one must understand the functionality of the old. Based on intensive research SCHOMBURG ICS GmbH developed an innovative conductive floor coating system, which complies with
the market requirements in quality and in particular, efficiency in every respect: INDUFLOOR-IB3350-VC2!
When may one talk about innovation? Innovation literally means “Newness and renewal”. In order to produce something new then one must understand the functionality of the old. Based on intensive research SCHOMBURG ICS GmbH developed an innovative conductive floor coating system, which complies with
the market requirements in quality and in particular, efficiency in every respect: INDUFLOOR-IB3350-VC2!

Efficiency and security – DIBT approved – in the restoration of sewers with GEPOTECH-11/22
SCHOMBURG ICS GmbH started the middle of 2008 with the new GEPOTECH-11/22 system for the restoration of sewers with DIBT approval in communal areas. The system belongs to a new generation of high quality spray applied coatings, whereby the damaged chambers are seamlessly and completely coated from the inside with a polyurea foam in combination with a special primer specially developed for these categories of exposure.
SCHOMBURG ICS GmbH started the middle of 2008 with the new GEPOTECH-11/22 system for the restoration of sewers with DIBT approval in communal areas. The system belongs to a new generation of high quality spray applied coatings, whereby the damaged chambers are seamlessly and completely coated from the inside with a polyurea foam in combination with a special primer specially developed for these categories of exposure.

Land drainage in Erding: Effective restoration of inspection chambers
In the course of the restoration of the sewage system in Erding, domestic service connections and inspection chambers on the land were also systematically inspected and restored. The Sewage Treatment Association for Erdinger Moos (AZV) as the employer and its Engineers Office were quite innovative in their approach to the restoration concept. The centre of the restoration was Müllerstraße where 42 defects situated in concrete shafts, predominantly on private land, were quickly and effectively restored with the new coating system GEPOTECH-EP-11/22 from SCHOMBURG ICS GmbH.
In the course of the restoration of the sewage system in Erding, domestic service connections and inspection chambers on the land were also systematically inspected and restored. The Sewage Treatment Association for Erdinger Moos (AZV) as the employer and its Engineers Office were quite innovative in their approach to the restoration concept. The centre of the restoration was Müllerstraße where 42 defects situated in concrete shafts, predominantly on private land, were quickly and effectively restored with the new coating system GEPOTECH-EP-11/22 from SCHOMBURG ICS GmbH.

Old ships seize the harbour city of Hamburg
Amidst the harbour city of Hamburg, which at the moment is the largest construction in Western Europe, the Sandtor harbour appears to be in new attire. An historic bridge leads from the Magellan Terraces to an established construction 8 m wide by 340 m long on eight pontoons, which offer space for up to 25 historic ships.
Amidst the harbour city of Hamburg, which at the moment is the largest construction in Western Europe, the Sandtor harbour appears to be in new attire. An historic bridge leads from the Magellan Terraces to an established construction 8 m wide by 340 m long on eight pontoons, which offer space for up to 25 historic ships.









